We've had two site visits since our last update and quite a few progress pictures to show off. Steel erection is complete on the Children's Wing (East wing) and exterior framing and sheathing has started going up. On the rear of this wing, our EIFS panels are going up (now complete). And no that's not snow, just little bits of styrofoam from planing the panels smooth. Below are all the pictures from this last weeks visit. Completed EIFS, including the corner piece which was a 1" V-notched 2'x2' grid which turned out perfect. Above is the new entrance lobby with all the structural steel up and exterior metal framing being attached. Below is the fully sheathed children's wing with the fluid a